IN SHORT

What is CCB?

CCB, short for Claude Codex Bridge, is a terminal UI that runs several AI coding CLIs at once in named tmux panes and gives them a way to hand work to each other. It sits in the Coding-Agent Harnesses & Runtimes category of the AI Coding tools and is open-source, written in Python.

Overview

CCB, short for Claude Codex Bridge, is a terminal UI that runs several AI coding CLIs at once in named tmux panes and gives them a way to hand work to each other. Each pane is a real, fully interactive terminal running the agent's own CLI — Codex, Claude, Gemini, Kimi, Qwen, Cursor, Copilot, OpenCode and a dozen more — so nothing is proxied or re-implemented, and you can take a pane over and type into it whenever you want.

Annotated screenshot of the CCB terminal layout, numbered: an agent sidebar listing main, worker, reviewer and ops roles; a main task pane; a CCB self-agent pane; a collaborator pane; a review and test pane; a comms and shortcuts panel; and a project status bar
The layout, labelled by the maintainers: roles in the sidebar, one live CLI per pane, comms and shortcuts down the leftCCB README ↗

The coordination layer is what distinguishes it from a tmux config. Panes are declared as named roles in a `.ccb/ccb.config` file using a compact window syntax, and a `/ask` command routes a request from one role to another, which makes dependency chains (A→B→C), fan-out (A→B,C) and fan-in (A,B→C) expressible. A shared `.ccb/ccb_memory.md` file gives every role the same durable project notes, and built-in skills (`ask`, `ccb-clear`, `ccb-compact`, `ccb-diagnose`) are injected into each agent.

A background daemon, `ccbd`, holds the session state, so closing the UI does not stop the agents working. Two optional layers sit on top: a Rich mode built on WezTerm and Yazi that adds a file browser, document editing and media preview next to the agent panes, and an Android remote controller with voice input, file transfer and terminal access that reaches the daemon over LAN, Tailscale or an end-to-end encrypted relay. By default the daemon binds to loopback only.

What it does

  • Runs 16+ coding CLI families concurrently in visible, fully interactive tmux panes you can take over at any time
  • Named roles and a `/ask` command that express chained, parallel and fan-in collaboration between agents
  • A background daemon (`ccbd`) that keeps project and session state alive when the UI is closed
  • Shared project memory in `.ccb/ccb_memory.md`, plus per-project topology and provider settings in `.ccb/ccb.config`
  • A visual config panel for windows, panes, providers, models, thinking levels and API overrides, with validate, dry-run and hot reload
  • Rich mode (WezTerm + Yazi) for file browsing, editing and media preview, and an Android remote controller with voice input
CCB in Rich mode: agent sidebar and two agent panes on the left, a Yazi file tree of the project's plans directory in the middle, and a rendered Markdown plan document on the right
Rich mode puts a file tree and a rendered document beside the agent panes, inside the same terminalCCB README ↗

Getting started

CCB installs as a global npm package and expects tmux plus whichever agent CLIs you want it to drive. A project is any directory containing a `.ccb` folder.

Install

A tarball and an install script are published as well, and there is a native Windows x64 build in beta.

bashbash
npm install -g @seemseam/ccb@latest

Anchor a project

Create the marker directory in the repository you want CCB to work on, then launch it there.

bashbash
mkdir -p .ccb
ccb

Declare your panes

Windows are named; inside a window, `,` stacks panes and `;` splits them. Each pane is `role:provider`, optionally in its own git worktree.

texttext
[windows]
main = "main:codex"
work = "worker1:codex(worktree), worker2:claude(worktree)"
review = "reviewer:claude, qa:gemini"
CCB's Config Control browser panel: a windows list, a binary split topology editor with a demo pane selected, and a selected-pane form setting pane type, agent name, workspace, provider, RolePack, model and thinking level, with validate, save and hot reload buttons
`ccb config ui` — the same topology as the config file, edited as a form and hot-reloaded into the running daemonCCB README ↗

Edit and validate the topology

The config panel edits the same file and can dry-run a reload before applying it.

bashbash
ccb config ui
ccb config validate

Route work between agents

From any pane, address another role by name; the reply comes back into your pane.

texttext
/ask reviewer review the latest parser changes and list blocking issues.

Add Rich mode or the mobile controller

Both are optional installs on top of the base package.

bashbash
ccb update rich
ccb update mobile

Commands and code are distilled from the project's own documentation — always check the official repo for the latest.

When to use it

  • Having one model write and another review, without copying diffs between terminal windows by hand
  • Comparing how two or three coding CLIs handle the same task, side by side on the same repository
CCB's Android remote controller listing the projects it is attached to, each with its path and a healthy status indicator
The Android controller attaches to the daemon and lists every project it is holding openCCB README ↗
  • Running workers in separate git worktrees so parallel agents do not fight over the same checkout
  • Checking on or steering a long-running agent session from a phone while the daemon keeps it alive

How CCB compares

CCB alongside other open-source coding-agent harnesses & runtimes tools AI/TLDR tracks, ranked by GitHub stars.

ToolStarsWhat it does
CC Switch★ 158kA cross-platform desktop app that manages provider configuration for eight coding-agent CLIs from one place, with a local failover proxy, MCP and skill management, and spend tracking.
Oh My OpenAgent★ 71.2kOpinionated agent bundle for OpenCode and Codex CLI that ships preconfigured sub-agents, lifecycle hooks and built-in MCP servers behind a single ultrawork command.
herdr★ 53.7kA single-binary terminal multiplexer built for coding agents: persistent sessions across local and SSH machines, per-pane working/blocked/idle status, and a socket API agents drive themselves.
oh-my-claudecode★ 41.1kA plugin and CLI that adds multi-agent orchestration to Claude Code: staged autopilot workflows, parallel tmux workers, and advisors that route a second opinion to Codex, Gemini, Grok or Cursor.
DSH Go★ 35.2kA native Android client for DeepSeek Harness that runs the agent on the phone in a built-in Linux environment or drives DSH on your computer or server over SSH, with plugins and phone control.
AionUi★ 34.6kAn open-source desktop workspace that pairs a built-in agent engine with dozens of external CLI agents, adding scheduled runs, MCP tools and remote access from a WebUI or chat apps.
cc-connect★ 16.5kA Go daemon that bridges local coding agents — Claude Code, Codex, Cursor Agent, Gemini CLI, OpenCode, Kimi CLI and more — to Feishu, DingTalk, Slack, Telegram, Discord, LINE and WeCom, so you drive them from chat.
CCB★ 3.6kA tmux workspace that runs several coding CLIs side by side and lets them talk